Welcome
Username:

Password:


Remember me

[ ]
Basic Agreement
Letter 13: Wire Mill Crewing

Item 13 - Wire Mill Crewing



In the event of urgent operational requirements, the Company may temporarily change the composition of job assignments upon discussion between the Division Head and Chief Steward.

In establishing job assignments, the Company will give full consideration to the practical size of the work area on each job assignment and will avoid, where possible, assigning machines to an operator outside of a contiguous line of machines.

The Company will provide the Union with lists of job assignments for wire drawing and nail machine jobs. These crewing of job assignments will be in accordance with the Basic Agreement and this letter. The Company will give the Union as much notice as possible of any changes or additions to the listed job assignments.




Go to page   <<        >>  
Opinions expressed here are the personal opinions of the original authors, and do not necessarily reflect the views of USW Local 5328.
All USW Local 5328 names and trademarks are the property of USW Local 5328 in Canada and other countries.
All contents are Copyright by United Steelworkers LOCAL 5328. All rights reserved. No part of this site may be reproduced without consent.

Designed by a SteelWorker For SteelWorkers - ©2013-2015 USW Local 5328